Calculate shoreline and slope tonnage using armor-layer depth, not shallow landscaping coverage.

Enter your project dimensions

ft
Enter a length greater than 0
ft
Enter a width greater than 0
ft
Enter a diameter greater than 0
in
Enter a depth between 0.25 and 24 inches

A ton of riprap covers only about 17 square feet, and that is expected. Armor rock is placed in layers 12 inches deep or more, so each ton goes about a tenth as far as landscape rock. The pile can seem small until you see the bank area it must cover. This calculator factors in layer depth, using 3,100 lb per cubic yard for material generally sized 4 to 12 inches and larger.

How to measure an armored bank

  1. Measure along the slope, from top to bottom, rather than across the level ground. Multiply that distance by the shoreline or channel length.
  2. For the rock layer, allow 1.5 to 2 times the diameter of the largest stone. A 12-inch depth is the practical floor for erosion control.
  3. Divide cubic feet by 27 for cubic yards, then multiply by 1.55 for tons.
Tons = (Slope-face area sq ft × Layer thickness in ÷ 12) ÷ 27 × 1.55

Per-ton coverage

Layer thickness1 ton coversTons per 100 sq ft
12 inches≈ 17 sq ft5.7
18 inches≈ 12 sq ft8.6
24 inches≈ 9 sq ft11.5

How to place stone so it holds

  • Prepare the base before placing rock: lay non-woven geotextile beneath it, or use 3-4 inches of #4 stone. Riprap set straight on soil can appear stable for a season, but undermining below the bank can cause it to settle.
  • Build a buried toe by setting the lowest row beneath the waterline or expected scour depth. A riprap slope usually comes apart starting at its base.
  • Prepare a 2:1 slope or flatter before installing stone. Banks steeper than that call for engineering, not just extra rock.
  • Place the exposed upper course by hand or machine, fitting each stone against the next rather than leaving it where it lands.
  • Extend the apron 4-6 pipe diameters beyond a culvert outlet. The flow can scour the ground in that downstream area.

Example: 50 feet of pond bank

For 50 feet of shoreline with a 6-foot slope face, the area is 300 square feet. Using an 18-inch layer: 300 x 1.5 = 450 cubic feet = 16.7 cubic yards, or about 26 tons of riprap and 27 with the small allowance. Plan for a roll of geotextile, or about 4 tons of #4 stone if rock bedding is preferred. Before ordering, check the truck path. Along wet Puget Sound ground, the last 20 feet to a pond edge can trap a loaded truck, and moving stone twice costs twice.

Following the first major storm

After the water recedes, make a pass along the bank. Check the toe for displaced rock, exposed soil in the gaps, visible fabric, and any erosion around the outfall apron. Put shifted stones back in place, use reserve rock to cover sparse areas, and address any digging. Ten minutes of checking a couple of times each year keeps the riprap doing its job without much ongoing work.

Stone sizes at a glance

Choose stone for the water force involved. Riprap from four to eight inch works for pond banks, slow streams and downspout outfalls. Eight to twelve is suited to lake edges with boat wake and quicker channels. Highways and spillways use engineered specifications for class and depth, so follow the plans rather than this page. If choosing between sizes, use the larger stone with a thicker layer; added weight gives more margin.

Riprap sizing, tonnage and installation

How can I estimate the rip rap I need?
Multiply slope-face area by the layer thickness in feet, then divide by 27 and multiply by 1.55. On a 10 x 10 test patch with 12 inches of depth, the result is 37 cubic feet and about 2.1 tons.
How much coverage comes from 1 ton of riprap?
Expect roughly 17 square feet of coverage with a 12-inch layer and 12 with 18 inches. For a budget estimate, allow 5.5 to 6 tons for each 100 square feet at the standard layer.
How large is 1 ton of rip rap?
A ton forms a pile near two-thirds of a cubic yard, roughly the volume of a washing machine. At the 6-8 inch size, that is 25-35 stones. It may not look like much piled up, but spread to the proper depth it covers a 4 x 4 section of bank.
What is the cost of 1 ton of rip rap?
Riprap is priced above construction stone and grouped by size class. The current amount appears on our RipRap product page, and delivery is free. Fabric and bedding stone add a fraction more, and both are worth including in the base.
What layer depth does rip rap need?
Keep the layer at one and a half to two times the largest stone dimension, with 12 inches as the minimum. For typical 4-12 inch residential stone, use 12-18 inches. Larger rock or fast water calls for 24.
Is hand placement possible for rip rap?
For material up to about 6-8 inch, hand placement is possible with gloves and a strong back, though a ton involves 25-35 lifts. Use machinery for larger stone. A skid steer can set in an hour what a crew hand-places in a day.

Protecting banks with armor stone.

RipRap is available by the ton with free delivery, along with #4 bedding stone for the layer underneath.

Shop RipRap

Arrange an aggregate purchase from this calculator's result